Offices, shops, and rental units painted on a schedule that keeps your doors open and your staff working.
RCAG Professional House Painting Brother offers commercial painting in Austin. The work covers offices, retail spaces, restaurants, shops, hallways, restrooms, and exterior walls and doors on business property. A commercial repaint is judged on two things: how the finish holds up to daily traffic, and how little the business has to stop while it happens.
A vacant unit is open floor, and work moves in a straight line from prep to final coat. An occupied space is a puzzle of desks, inventory, equipment, customers, and dry times that have to land between them. That changes the plan, not the paint: smaller sections, more masking, more setup and takedown each day, and room by room sequencing so the business keeps running. Ask for the phasing plan before the job starts, not after the first wall goes wet.
Corridors, break rooms, restrooms, and anything at cart height take scuffs, cart bumps, and hand marks all day, and flat paint cannot be scrubbed without leaving a burnished shine. Eggshell, satin, and the harder scrubbable finishes clean up instead. There is a trade off worth knowing. The shinier the finish, the more it shows wall imperfections under fluorescent light, so wall repair matters more in commercial spaces than most owners expect. Bad walls plus high sheen equals a job that looks worse than before.
The old tenant leaves anchors, TV mounts, shelf brackets, and holes behind, and paint alone frames every one of them. Before color, those holes get backed and patched and the texture gets matched, which is its own trade. See drywall repair for how those patches are handled. A turnover schedule also runs tight, so the honest question to ask any painter is how many days the space is actually out of service, start to finish.
Paint over rust is a countdown, because the rust keeps working under the film and pushes it off, usually at the bottom of a door frame or a railing base where water sits. The metal has to be taken back to sound material and spot primed with a product made for metal before any color goes on. The same goes for bare galvanized surfaces, which need the right primer or the topcoat simply slides off in sheets later.
Many commercial leases and property managers set the approved color palette, the sign band rules, and what a tenant can change on the exterior without written approval. Shopping centers are strict about it. Getting that approval in hand before the color is ordered avoids repainting a wall twice at your own cost. Property managers commonly want proof of insurance and a scheduled access window before anyone works on site, so those requests are normal and worth lining up early.
Texas does not license painters at the state level, and plain repainting of existing walls is not the kind of work a building permit covers. Permits enter the picture when the project includes signage, a build out, or changes to walls, wiring, or plumbing. Older commercial buildings also fall under federal lead safe rules if the work disturbs paint in areas built before 1978. Confirm your own scope with the City of Austin before the schedule is locked.
Every commercial paint job gets built around the hours a room can actually be empty, which is why the schedule question comes before the color question. We are open Monday to Saturday, 7 AM to 7 PM, and we paint for homes and businesses. Restaurants, clinics, and retail floors each have their own quiet windows, so the useful first conversation is about which spaces can be closed, for how long, and in what order. Businesses in Austin and the cities nearby plan turnovers this way.
For the full list of towns we reach, see our coverage area.



★★★★★
Our process is simple.
Austin
Round Rock
New Braunfels
Georgetown
Leander
Cedar Park
San Marcos
Pflugerville
Kyle
Hutto
Lakeway
Taylor
Buda
Lockhart